PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Backfilled underground storm piping between column lines G-G.1 facing South (800x600).jpg Compacting soil along column line 2.5 Facing East (800x600).jpg Compacting underground Storm piping Facing North (800x600).jpg Continued installing temporary stairs and platforms Facing South (800x600).jpg Continued installing the shear wall panels at Elev. 5,6 (3rd Floor) Facing West (800x600).jpg
Next page Backfilled underground storm piping between column lines G-G.1 facing South (800x600)
Backfilled underground storm piping between column lines G-G.1 facing South (800x600)